Home Battery Installation Checklist Before Commissioning

This checklist helps installers and project buyers collect the information required before commissioning a residential LiFePO4 battery.

Residential battery installation topology
Review the battery as part of the complete solar, inverter and load system.

1. Confirm the objective

Define solar self-consumption, essential-load backup, whole-home backup, time-of-use charging or off-grid operation.

2. Record exact equipment

  • Battery model, voltage and quantity
  • Inverter brand, model and firmware
  • PV size and charging capability
  • Backup circuits and generator requirement

3. Calculate energy and power separately

Average load × hours estimates AC energy. Add allowance for battery operating window, inverter losses and reserve. Separately record continuous load and starting demand.

Check Unit Purpose
Overnight use kWh Stored energy
Continuous load kW Sustained output
Starting load kW/seconds Motor starting

4. Inspect the location

Record temperature, sunlight, water exposure, wall or floor construction, clearances, weight, package dimensions and access route.

Battery dimensions for installation planning
Confirm dimensions and weight before planning mounting and access.

5. Define cables and protection

Verify DC cable size, length, terminals, torque, fuse/breaker/isolator and earthing according to the manual and local rules.

6. Verify communication

Check CAN/RS485 protocol, cable pinout, inverter profile, firmware and startup sequence. Use the compatibility review.

7. Commission and record

  • Serial numbers and firmware
  • Settings and torque checks
  • Communication and alarms
  • Controlled charge/discharge test
  • Installation photos and customer handover
Battery functional test station
Commissioning should confirm communications, alarms and controlled operation.

Review system accessories or request a project quotation.